Multi-Site Industrial Water Infrastructure Contracts
Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions
Information
- Client:
Rwanda Mountain Tea Ltd (RMT Group)
- Location:
(Rubaya, Nyabihu, Rutsiro, Mata – Nshili Region, and Gisakura,..).
- Date: 2025
- Category: Water Supply
Construction of pH chambers regulation and water filtration system
· Rubaya Tea Factory – Ngororero District
· Nyabihu Tea Factory – Nyabihu District
· Rutsiro Tea Factory – Rutsiro District
· Mata Tea Factory (Nshili Region) – Nyaruguru District
· Gisakura Tea Factory – Nyamasheke District, and many more…
This multi-site industrial intervention strengthened water capture efficiency, improved pipeline durability, enhanced reservoir integrity, and ensured sustainable industrial water supply systems for Rwanda Mountain Tea production facilities.
Description of the Assignment performed by our staff:
·Supply and installation of HDPE PN16 pipelines (various diameters)
· Supply and installation of PVC and PPR pipes and fittings
· Installation of GI flanged gate valves and hydraulic fittings
· Construction of sectional valve chambers
· Construction of air vent chambers
· Rehabilitation of natural water sources
· Construction and rehabilitation of 25m³ water reservoirs
· Rehabilitation of carbon steel water tanks
· Excavation, backfilling, and reinforced concrete pipeline protection works
· Construction of stone masonry manholes
· Construction of protection trenches for pipeline systems
Related Projects
Ndengo Project
System by using solar powered submersible pump sets-1 tons and kept 1 pump as a standby.
Nyagatare Projects
System by using solar powered submersible pupmp sets-1 ons and kept 1 pump as a standby. It is proposed to provideHDPE piipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines
Karongi Project
Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions
KAZEN/WASAC/JICA COOPERATION
Procurement and execution of works for rehabilitation of pipeline for the project for WASAC Utility turnaround with KAIZEN Approach
Got Questions?
Contact us today to schedule a consultation or to learn more about our services.