KANYONYOMBA NETWORK

Supply and Installation of Water equipment’s for extensions, rehabilitation and upgrading water network and water taps in BUGESERA District for KANYONYOMBA NETWORK.

Information

  • Client: BUGESERA District
  • Location: Bugesera District
  • Date: 2022
  • Category: Water Supply
  • Time: 12 Months

Qualifications Of Key Staff of the Project:

  • Water Engineer (1)
  • Civil Engineer (1)
  • Plumbers (6)
  • Construction technicians (4)

Description of the Assignment performed by our staff:

  • Supply of HDPE & PPR Pipes and their fitting
  • Rehabilitation of 8 Kmof pipeline
  • Extension of 5 Kmof water supply system
  • Construction of concrete water reservoir

Related Projects

Ndengo Project

System by using solar powered submersible pump sets-1 tons and kept 1 pump as a standby. 

Nyagatare Projects

System by using solar powered submersible pupmp sets-1 ons and kept 1 pump as a standby. It is proposed to provideHDPE piipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines

Multi-Site Industrial Water Infrastructure Contracts

Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions

KAZEN/WASAC/JICA COOPERATION

Procurement and execution of works for rehabilitation of pipeline for the project for WASAC Utility turnaround with KAIZEN Approach