KANYONYOMBA NETWORK
Supply and Installation of Water equipment’s for extensions, rehabilitation and upgrading water network and water taps in BUGESERA District for KANYONYOMBA NETWORK.
Information
- Client: BUGESERA District
- Location: Bugesera District
- Date: 2022
- Category: Water Supply
- Time: 12 Months
Qualifications Of Key Staff of the Project:
- Water Engineer (1)
- Civil Engineer (1)
- Plumbers (6)
- Construction technicians (4)
Description of the Assignment performed by our staff:
- Supply of HDPE & PPR Pipes and their fitting
- Rehabilitation of 8 Kmof pipeline
- Extension of 5 Kmof water supply system
- Construction of concrete water reservoir
Related Projects
Ndengo Project
System by using solar powered submersible pump sets-1 tons and kept 1 pump as a standby.
Nyagatare Projects
System by using solar powered submersible pupmp sets-1 ons and kept 1 pump as a standby. It is proposed to provideHDPE piipes 90mm PN 10 as main pipe to supply water to submains of reservoir and HDPE pipes 90,63,50mm PN 10 for lateral lines
Multi-Site Industrial Water Infrastructure Contracts
Supply and Rehabilitation of Water Catchment Areas in Different Rwanda Mountain Tea (RMT) Regions
KAZEN/WASAC/JICA COOPERATION
Procurement and execution of works for rehabilitation of pipeline for the project for WASAC Utility turnaround with KAIZEN Approach